18 July 2012

Day 135


Steel reinforcement for concrete wall



Shutter work for pouring concrete column 

15 July 2012

Day 132


Concrete column reinforcement



Reinforcement for concrete infill in retaining walls



The engineer husband



Basement progression 

27 May 2012

Day 83: Stormwater

The pipe visible in the photographs is a 160mmø stormwater pipe running through the length of our property. The purpose of this pipe is to assist in the movement of water runoff which comes from the hill on the nature reserve’s side. The pipe is bedded in soft sand and will be buried beneath the future floor slab.



19 April 2012

Day 45: Slow progress

Disappointingly, almost nothing has happened in the last 35 days. At least, nothing happened on site.

We went to Nepal to hike up to Everest Base Camp at 5364m above sea level. What an experience! But the most amazing thing is how sophisticated and detailed the construction methods are. With no road access and mechanical means the Nepali harvest all the building materials from the surrounding mountains. Skilled labor-intensive techniques are then used to shape the timber and stone to construct multi storey dwellings.

Currently we are waiting for a 24 ton pecker to remove some hard rock. Perhaps we can learn a thing or two about breaking rock from the mountain people.