Showing posts with label foundations. Show all posts
Showing posts with label foundations. Show all posts

31 May 2012

Day 87: Concrete for foundations

Oh, what excitement. Every person on site spent the day rushing to get everything in place before the concrete trucks came at 03:30pm. The plastic layer of DPC was arranged in place. The steel reinforcement was bent, positioned and inspected by the engineer. And finally, the concrete was brought in and poured smoothly into place. It splashed everywhere. For a curious little architect it meant dirty jeans and a camera full of concrete spray.




27 May 2012

Day 83: Stormwater

The pipe visible in the photographs is a 160mmø stormwater pipe running through the length of our property. The purpose of this pipe is to assist in the movement of water runoff which comes from the hill on the nature reserve’s side. The pipe is bedded in soft sand and will be buried beneath the future floor slab.