Do you remember the blog post about the concrete wall finish which reveals the timber grains of the shutter boards?  At this stage the shutter work sub-contractor is carefully installing timber planks as a lining into the form work. The planks are oiled with shutter oil prior to being fixed. Thereafter the sub-contractor sprays them with water twice a day, to ensure that they are saturated with water and won’t absorb the water from the concrete mix. When the concrete is poured it will move in between the rough grains of the timber and leave a grainy imprint on the final surface. 