The cavity walls consist of 110mm brick, 110mm air, 110mm
brick and an additional 110mm stone on the outer façade. Butterfly wall ties
are built into the wall to secure the two brick sleeves. A plastic layer, damp
proof course (DPC), is installed above the floor level to prevent damp to
gather in the cavity. Weep holes are located above the DPC to allow the
moisture to escape.
This is the opening for our dog door. The dog house will be built
into the store room with a door to the outside and a door to the inside.
It is difficult to report on the overall progress. The
ground floor walls are almost up, but there is a lot that needs to be done
before the next slab can be cast. Steel columns need to be installed to help carry
the weight of the first floor slab. Two small slabs above the store rooms and scullery
need to be cast. The braai and fireplace must be built in. Let’s just say that it
is not going to happen this year.