On photographs everything looks so calm and in control. In
reality however…the site was in total chaos. The concrete was supposed to
arrive at 8am. Instead, we were all running around until 12pm installing drainage,
tying down steel mesh, fixing shutter boards and getting serious sunburn.
Finally when everything was in place the concrete pouring
could start. They poured the balconies first. The concrete mixture contained a
waterproofing admixture mixed into the concrete prior to delivery.
As they pour, someone directs the flow, someone else vibrates
the concrete, another person starts levelling and before you know it you have a
ground floor slab complete with electrical conduits and plumbing pipes.