Oh, what excitement. Every
person on site spent the day rushing to get everything in place before the
concrete trucks came at 03:30pm. The plastic layer of DPC was arranged in place.
The steel reinforcement was bent, positioned and inspected by the engineer. And
finally, the concrete was brought in and poured smoothly into place. It splashed everywhere. For a curious little architect it meant dirty jeans and a camera
full of concrete spray.
No comments:
Post a Comment